Constructed 2003 Constructed 2008 Constructed 2015 TOTAL
Inflow
(AF/yr)
Construction
Cost
Estimate
OM&R
$M/yr
Energy
Cost
$M/yr
Construction
Cost
Estimate
OM&R
$M/yr
Energy
Cost
$M/yr
Construction
Cost
Estimate
OM&R
$M/yr
Energy
Cost
$M/yr
Construction
Cost
Estimate
OM&R
$M/yr
Energy
Cost
$M/yr
ALT1      2 Concentration Ponds
1.36 18 2.1 0 460 1.6 0.1 0 0 0 478 3.7 0.1
1.06 18 2.1 0 460 1.6 0.1 450 1.4 0 928 5.1 0.1
0.8 18 2.1 0 460 1.6 0.1 450 1.4 0 928 5.1 0.1
ALT2      Bombay Beach EES
1.36 18 2.1 0 335 9.1 3 0 0 0 353 11.2 3
1.06 18 2.1 0 335 9.1 3 460 1.4 0 813 12.6 3
0.8 18 2.1 0 335 9.1 3 460 1.4 0 813 12.6 3
ALT3      Test Base EES
1.36 18 2.1 0 430 9.5 3 0 0 0 448 11.6 3
1.06 18 2.1 0 430 9.5 3 460 1.4 0 908 13 3
0.8 18 2.1 0 430 9.5 3 460 1.4 0 908 13 3
ALT4      EES & Concentration Pond
1.36 18 2.1 0 580 7.1 2.1 0 0 0 598 9.2 2.1
1.06 18 2.1 0 580 7.1 2.1 460 1.4 0 1058 10.6 2.1
0.8 18 2.1 0 580 7.1 2.1 460 1.4 0 1058 10.6 2.1
ALT5      EES in In-Sea Pond
1.36 18 2.1 0 405 6.4 16.4 0 0 0 423 8.5 16.4
1.06 18 2.1 0 405 6.4 16.4 460 1.4 0 883 9.9 16.4
0.8 18 2.1 0 405 6.4 16.4 460 1.4 0 883 9.9 16.4