| Constructed 2003 | Constructed 2008 | Constructed 2015 | TOTAL | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Inflow (AF/yr) |
Construction Cost Estimate |
OM&R $M/yr |
Energy Cost $M/yr |
Construction Cost Estimate |
OM&R $M/yr |
Energy Cost $M/yr |
Construction Cost Estimate |
OM&R $M/yr |
Energy Cost $M/yr |
Construction Cost Estimate |
OM&R $M/yr |
Energy Cost $M/yr |
| ALT1 2 Concentration Ponds | ||||||||||||
| 1.36 | 18 | 2.1 | 0 | 460 | 1.6 | 0.1 | 0 | 0 | 0 | 478 | 3.7 | 0.1 |
| 1.06 | 18 | 2.1 | 0 | 460 | 1.6 | 0.1 | 450 | 1.4 | 0 | 928 | 5.1 | 0.1 |
| 0.8 | 18 | 2.1 | 0 | 460 | 1.6 | 0.1 | 450 | 1.4 | 0 | 928 | 5.1 | 0.1 |
| ALT2 Bombay Beach EES | ||||||||||||
| 1.36 | 18 | 2.1 | 0 | 335 | 9.1 | 3 | 0 | 0 | 0 | 353 | 11.2 | 3 |
| 1.06 | 18 | 2.1 | 0 | 335 | 9.1 | 3 | 460 | 1.4 | 0 | 813 | 12.6 | 3 |
| 0.8 | 18 | 2.1 | 0 | 335 | 9.1 | 3 | 460 | 1.4 | 0 | 813 | 12.6 | 3 |
| ALT3 Test Base EES | ||||||||||||
| 1.36 | 18 | 2.1 | 0 | 430 | 9.5 | 3 | 0 | 0 | 0 | 448 | 11.6 | 3 |
| 1.06 | 18 | 2.1 | 0 | 430 | 9.5 | 3 | 460 | 1.4 | 0 | 908 | 13 | 3 |
| 0.8 | 18 | 2.1 | 0 | 430 | 9.5 | 3 | 460 | 1.4 | 0 | 908 | 13 | 3 |
| ALT4 EES & Concentration Pond | ||||||||||||
| 1.36 | 18 | 2.1 | 0 | 580 | 7.1 | 2.1 | 0 | 0 | 0 | 598 | 9.2 | 2.1 |
| 1.06 | 18 | 2.1 | 0 | 580 | 7.1 | 2.1 | 460 | 1.4 | 0 | 1058 | 10.6 | 2.1 |
| 0.8 | 18 | 2.1 | 0 | 580 | 7.1 | 2.1 | 460 | 1.4 | 0 | 1058 | 10.6 | 2.1 |
| ALT5 EES in In-Sea Pond | ||||||||||||
| 1.36 | 18 | 2.1 | 0 | 405 | 6.4 | 16.4 | 0 | 0 | 0 | 423 | 8.5 | 16.4 |
| 1.06 | 18 | 2.1 | 0 | 405 | 6.4 | 16.4 | 460 | 1.4 | 0 | 883 | 9.9 | 16.4 |
| 0.8 | 18 | 2.1 | 0 | 405 | 6.4 | 16.4 | 460 | 1.4 | 0 | 883 | 9.9 | 16.4 |